Fiven Norge avd. Eydehavn

Permit and control reports (Norwegian only): Permit, Control report 2009, Control report 2011, Control report 2015, Control report 2020, Control report 2023
Monitoring report for the water body: 2015, 2019, 2021, 2023

Authority: Miljødirektoratet